Revision history of "Technological research to create a next generation small 100 keV boron implantation device with a TRL level close to 4" (Q3056434)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

12 June 2023

3 August 2022

  • curprev 20:0620:06, 3 August 2022DG Regio talk contribs 121,295 bytes +79,549 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:0018:00, 28 November 2021DG Regio talk contribs 31,449 bytes +4,831 Created claim: summary (P836): De doelstellingen van het project (de ontwikkeling van een nieuwe generatie implantatietechnologie/apparatuur die uiteindelijk tot doel heeft deze in Letland te produceren en te gebruiken, alsmede de uitvoer) zijn passend (en de verwezenlijking ervan zal een belangrijke bijdrage leveren) aan de nationale RIS3-strategie: „slimme materialen, technologie en technische systemen”. Zij sluiten aan bij de eerste, tweede en zesde groeiprioriteiten van d...
  • curprev 18:0018:00, 28 November 2021DG Regio talk contribs 26,618 bytes +199 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:2509:25, 28 November 2021DG Regio talk contribs 26,419 bytes +4,773 Created claim: summary (P836): Die Ziele des Projekts (Entwicklung einer neuen Generation von Implantationstechnologien/Ausrüstungen mit dem Ziel, sie in Lettland herzustellen und zu nutzen, sowie Exporte) sind angemessen (und ihr Erreichen wird einen wesentlichen Beitrag leisten) zu der nationalen RIS3-Strategie: „intelligente Werkstoffe, Technologien und technische Systeme“. Sie stehen im Einklang mit den ersten, zweiten und sechsten Wachstumsprioritäten der RIS-Strategie....
  • curprev 09:2509:25, 28 November 2021DG Regio talk contribs 21,646 bytes +214 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 19:3419:34, 25 November 2021DG Regio talk contribs 21,432 bytes +5,096 Created claim: summary (P836): Les objectifs du projet (développer une nouvelle génération de technologies/équipements d’implantation, dans le but ultime de les produire et de les utiliser en Lettonie, ainsi que l’exportation) sont appropriés (et leur réalisation apportera une contribution significative) à la stratégie nationale RIS3: «matériaux intelligents, technologies et systèmes d’ingénierie». Elles sont conformes aux première, deuxième et sixième priorités de croissance...
  • curprev 19:3419:34, 25 November 2021DG Regio talk contribs 16,336 bytes +238 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:3412:34, 15 July 2021DG Regio talk contribs 15,678 bytes +178 Changed label, description and/or aliases in en: translated_label
  • curprev 12:3412:34, 15 July 2021DG Regio talk contribs 15,500 bytes +4,028 Created claim: summary (P836): The objectives of the project (developing the technical facilities/assembly of a new generation of implanting technology, with the ultimate goal of producing and using them in Latvia, as well as exporting them in the future) are relevant (and will make a significant contribution to their achievement) towards the national RIS3 strategy: Intelligent Materials, Technologies and Engineering Systems. They are in line with the first, second and sixth...

14 July 2021

13 July 2021