Revision history of "DRAINAGE NETWORK OF OLIVEIRA DE AZEMÉIS-FAJÕES AND MADAÍL" (Q2982957)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:5719:57, 3 August 2022DG Regio talk contribs 41,717 bytes +25,227 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:5408:54, 9 July 2021DG Regio talk contribs 9,394 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1302:13, 9 July 2021DG Regio talk contribs 8,963 bytes +1,214 Created claim: summary (P836): The operation aims to extend the drainage network of waste water to populations not yet served in certain intervention areas of the municipality of Oliveira de Azeméis, namely Fajões, Oliveira de Azeméis, Santiago de Riba-Ul and Madail. The implementation of the operation will make it possible to reach a further 2 883 inhabitants, resulting in an increase in the coverage rate of 4.07 %., translated_summary
  • curprev 02:1302:13, 9 July 2021DG Regio talk contribs 7,749 bytes −1,214 Removed claim: summary (P836): The operation aims to extend the drainage network of waste water to populations not yet served in certain intervention areas of the municipality of Oliveira de Azeméis, namely Fajões, Oliveira de Azeméis, Santiago de Riba-Ul and Madail. The implementation of the operation will make it possible to reach a further 2 883 inhabitants, resulting in an increase in the coverage rate of 4.07 %., remove_old_english_translation
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 8,963 bytes +119 Changed label, description and/or aliases in en: translated_label
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 8,844 bytes +1,214 Created claim: summary (P836): The operation aims to extend the drainage network of waste water to populations not yet served in certain intervention areas of the municipality of Oliveira de Azeméis, namely Fajões, Oliveira de Azeméis, Santiago de Riba-Ul and Madail. The implementation of the operation will make it possible to reach a further 2 883 inhabitants, resulting in an increase in the coverage rate of 4.07 %., translated_summary

8 July 2021

7 July 2021