Revision history of "Mondim de Basto Elevatory System (SAR Britelo)" (Q2982945)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:5719:57, 3 August 2022DG Regio talk contribs 38,277 bytes +22,741 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:5408:54, 9 July 2021DG Regio talk contribs 9,082 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1302:13, 9 July 2021DG Regio talk contribs 8,651 bytes +1,078 Created claim: summary (P836): The Candidature aims to cover the population currently served by the Mondim de Basto treatment plant, as well as the additional population associated with the expansion of the Wastewater Network, under construction under Operation POSEUR-03-2012-FC-000901,, translated_summary
  • curprev 02:1302:13, 9 July 2021DG Regio talk contribs 7,573 bytes −1,078 Removed claim: summary (P836): The Candidature aims to cover the population currently served by the Mondim de Basto treatment plant, as well as the additional population associated with the expansion of the Wastewater Network, under construction under Operation POSEUR-03-2012-FC-000901,, remove_old_english_translation
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 8,651 bytes +105 Changed label, description and/or aliases in en: translated_label
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 8,546 bytes +1,078 Created claim: summary (P836): The Candidature aims to cover the population currently served by the Mondim de Basto treatment plant, as well as the additional population associated with the expansion of the Wastewater Network, under construction under Operation POSEUR-03-2012-FC-000901,, translated_summary

8 July 2021

7 July 2021