Revision history of "Renewal of Water Supply Networks (Ribeira Brava, Câmara de Lobos, Machico and Santana)" (Q2982936)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:5719:57, 3 August 2022DG Regio talk contribs 42,631 bytes +26,727 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:5408:54, 9 July 2021DG Regio talk contribs 8,239 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1302:13, 9 July 2021DG Regio talk contribs 7,808 bytes +1,230 Created claim: summary (P836): The Operation aims at correcting identified operational situations (supply failures), which consist of replacing sections of undersised networks, where there are misadjusted, low flow pressures. The construction of 2 EE will make it possible to increase the distribution capacity, to address the lack of pressure on supply in those areas, since the network implemented is insufficient to satisfy consumption., translated_summary
  • curprev 02:1302:13, 9 July 2021DG Regio talk contribs 6,578 bytes −1,230 Removed claim: summary (P836): The Operation aims at correcting identified operational situations (supply failures), which consist of replacing sections of undersised networks, where there are misadjusted, low flow pressures. The construction of 2 EE will make it possible to increase the distribution capacity, to address the lack of pressure on supply in those areas, since the network implemented is insufficient to satisfy consumption., remove_old_english_translation
  • curprev 02:0502:05, 9 July 2021DG Regio talk contribs 7,808 bytes +146 Changed label, description and/or aliases in en: translated_label
  • curprev 02:0502:05, 9 July 2021DG Regio talk contribs 7,662 bytes +1,230 Created claim: summary (P836): The Operation aims at correcting identified operational situations (supply failures), which consist of replacing sections of undersised networks, where there are misadjusted, low flow pressures. The construction of 2 EE will make it possible to increase the distribution capacity, to address the lack of pressure on supply in those areas, since the network implemented is insufficient to satisfy consumption., translated_summary

7 July 2021