Revision history of "Installation and Benefit of Equipment for Water and Energy Efficiency in Low Systems, with a view to the Control and Reduction of Loss in the Water Distribution and Aduction Systems" (Q2982854)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:5419:54, 3 August 2022DG Regio talk contribs 46,194 bytes +28,309 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:5008:50, 9 July 2021DG Regio talk contribs 9,716 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1202:12, 9 July 2021DG Regio talk contribs 9,285 bytes +1,253 Created claim: summary (P836): The application consists of the creation of 70 ZMC’s in the 1.390 Km network and the installation of 70 flow meters, 147 sectioning valves and 5 pressure-reducing systems in the existing AA infrastructure installation of computer equipment for network and communication management, aiming at reducing real water losses, which are estimated to be 10 % after the completion of the contract to be carried out under this application., translated_summary
  • curprev 02:1202:12, 9 July 2021DG Regio talk contribs 8,032 bytes −1,253 Removed claim: summary (P836): The application consists of the creation of 70 ZMC’s in the 1.390 Km network and the installation of 70 flow meters, 147 sectioning valves and 5 pressure-reducing systems in the existing AA infrastructure installation of computer equipment for network and communication management, aiming at reducing real water losses, which are estimated to be 10 % after the completion of the contract to be carried out under this application., remove_old_engli...
  • curprev 01:4301:43, 9 July 2021DG Regio talk contribs 9,285 bytes +241 Changed label, description and/or aliases in en: translated_label
  • curprev 01:4301:43, 9 July 2021DG Regio talk contribs 9,044 bytes +1,253 Created claim: summary (P836): The application consists of the creation of 70 ZMC’s in the 1.390 Km network and the installation of 70 flow meters, 147 sectioning valves and 5 pressure-reducing systems in the existing AA infrastructure installation of computer equipment for network and communication management, aiming at reducing real water losses, which are estimated to be 10 % after the completion of the contract to be carried out under this application., translated_summary

8 July 2021

7 July 2021