Revision history of "Closing Water Supply Systems in Low Subsystem of Four Water Supply" (Q2982828)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:5419:54, 3 August 2022DG Regio talk contribs 41,863 bytes +25,095 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:5008:50, 9 July 2021DG Regio talk contribs 9,480 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:4201:42, 9 July 2021DG Regio talk contribs 9,049 bytes +125 Changed label, description and/or aliases in en: translated_label
  • curprev 01:4201:42, 9 July 2021DG Regio talk contribs 8,924 bytes +1,209 Created claim: summary (P836): The operation Closure of Water Supply Systems in Low Subsystem of Supply of Four Waters, intends to carry out the construction of distributing ducts in PVC PN10 DN63, with an approximate extension of 635 ml, as well as the installation of 9 domestic branches, in place of Casal de S. Miguel, through the extension of the existing water distribution network in the place of Quatro Águas., translated_summary

8 July 2021

7 July 2021