Revision history of "Redevelopment of the Santana Sanitation Subsystem – connection from Monte do Pardo to the Arneiro Water Treatment Plant" (Q2982813)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

4 November 2022

3 August 2022

  • curprev 19:5319:53, 3 August 2022DG Regio talk contribs 43,373 bytes +26,348 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

20 October 2021

15 September 2021

9 July 2021

  • curprev 08:3708:37, 9 July 2021DG Regio talk contribs 9,503 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1402:14, 9 July 2021DG Regio talk contribs 9,072 bytes +1,220 Created claim: summary (P836): The operation aims at the construction of a lifting station and 2,951 m of emissary to connect the domestic waste water from the town of Monte do Pardo to the Monte do Arneiro treatment plant.The town of Monte do Pardo has a network of drainage of waste water through a network of gravitic collectors in ceramic stoneware with about 1,000 m of extension that drain to the septic tank of the system., translated_summary
  • curprev 02:1402:14, 9 July 2021DG Regio talk contribs 7,852 bytes −1,220 Removed claim: summary (P836): The operation aims at the construction of a lifting station and 2,951 m of emissary to connect the domestic waste water from the town of Monte do Pardo to the Monte do Arneiro treatment plant.The town of Monte do Pardo has a network of drainage of waste water through a network of gravitic collectors in ceramic stoneware with about 1,000 m of extension that drain to the septic tank of the system., remove_old_english_translation
  • curprev 02:1402:14, 9 July 2021DG Regio talk contribs 9,072 bytes +181 Changed label, description and/or aliases in en: translated_label
  • curprev 02:1402:14, 9 July 2021DG Regio talk contribs 8,891 bytes +1,220 Created claim: summary (P836): The operation aims at the construction of a lifting station and 2,951 m of emissary to connect the domestic waste water from the town of Monte do Pardo to the Monte do Arneiro treatment plant.The town of Monte do Pardo has a network of drainage of waste water through a network of gravitic collectors in ceramic stoneware with about 1,000 m of extension that drain to the septic tank of the system., translated_summary

8 July 2021

7 July 2021