Revision history of "Closure of Waste Water Sanitation Systems Connection to the Atalayan Wastewater Treatment Plant" (Q2982802)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:5319:53, 3 August 2022DG Regio talk contribs 42,272 bytes +25,717 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:3708:37, 9 July 2021DG Regio talk contribs 9,419 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1402:14, 9 July 2021DG Regio talk contribs 8,988 bytes +154 Changed label, description and/or aliases in en: translated_label
  • curprev 02:1402:14, 9 July 2021DG Regio talk contribs 8,834 bytes +1,190 Created claim: summary (P836): The operation consists of the execution of 3568.50 ml of gravitic collectors, 2 lifting systems totaling 796.71 ml of lifting ducts and 66 connecting branches, with connection to the Atalaia Sanitation Subsystem and final treatment in the Atalayan treatment plant, with discharge of the effluent into the water line located in the vicinity of the said treatment plant., translated_summary

8 July 2021

7 July 2021