Revision history of "Closure of Wastewater Sanitation Systems Connection to the Pedrogão Grande Wastewater Treatment Plant" (Q2982800)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:5319:53, 3 August 2022DG Regio talk contribs 42,432 bytes +25,771 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:3608:36, 9 July 2021DG Regio talk contribs 9,477 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1402:14, 9 July 2021DG Regio talk contribs 9,046 bytes +162 Changed label, description and/or aliases in en: translated_label
  • curprev 02:1402:14, 9 July 2021DG Regio talk contribs 8,884 bytes +1,208 Created claim: summary (P836): The operation consists of the execution of 13242.50 ml of gravitic collectors, 3 Elevatory Stations, 1214.98 ml of lifting ducts and 163 connecting branches, with connection to the Pedrogão Grande Sanitation Subsystem and final treatment in the treatment plant of Pedrogão Grande, with discharge of the effluent into the water line located in the vicinity of the said treatment plant., translated_summary

8 July 2021

7 July 2021