Revision history of "Closure of Wastewater Sanitation Systems Connection to the Wastewater Treatment Plant of the Vila de Figueiró dos Vinhos" (Q2982762)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:5219:52, 3 August 2022DG Regio talk contribs 42,669 bytes +25,894 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:4408:44, 9 July 2021DG Regio talk contribs 9,475 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1302:13, 9 July 2021DG Regio talk contribs 9,044 bytes +181 Changed label, description and/or aliases in en: translated_label
  • curprev 02:1302:13, 9 July 2021DG Regio talk contribs 8,863 bytes +1,213 Created claim: summary (P836): The operation consists of the execution of 42.91 km of drainage network, 670 connecting branches and 12 Elevatory Stations with connection to the Sanitation Subsystem of the Water Treatment Plant of the Vila de Figueiró dos Vinhos and final treatment at the treatment plant of the Vila de Figueiró dos Vinhos, with discharge to the waterline that is in the vicinity of the treatment plant., translated_summary

8 July 2021

7 July 2021