Revision history of "Integrated depollution of the Alguidar do Dueça – Implementation of sewage sewage networks – Connection to the Quinta de Cima sewage treatment plant" (Q2982683)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:5019:50, 3 August 2022DG Regio talk contribs 45,986 bytes +28,447 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:2908:29, 9 July 2021DG Regio talk contribs 9,698 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1102:11, 9 July 2021DG Regio talk contribs 9,267 bytes +1,276 Created claim: summary (P836): The operation consists of the execution of 4 lifting systems, consisting of 4 EE and 1153,82 ml of lifting ducts, 42908 ml of gravitic collectors running 749 connecting branches, which will drain several clusters not yet served in the area of influence of the subsystem (low) and that will have connection to the E1 (high) penella-Emissary subsystem and final treatment at the Quinta de Cima treatment plant, with discharge of the effluent to Rio Du...
  • curprev 02:1102:11, 9 July 2021DG Regio talk contribs 7,991 bytes −1,276 Removed claim: summary (P836): The operation consists of the execution of 4 lifting systems, consisting of 4 EE and 1153,82 ml of lifting ducts, 42908 ml of gravitic collectors running 749 connecting branches, which will drain several clusters not yet served in the area of influence of the subsystem (low) and that will have connection to the E1 (high) penella-Emissary subsystem and final treatment at the Quinta de Cima treatment plant, with discharge of the effluent to Rio...
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 9,267 bytes +213 Changed label, description and/or aliases in en: translated_label
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 9,054 bytes +1,276 Created claim: summary (P836): The operation consists of the execution of 4 lifting systems, consisting of 4 EE and 1153,82 ml of lifting ducts, 42908 ml of gravitic collectors running 749 connecting branches, which will drain several clusters not yet served in the area of influence of the subsystem (low) and that will have connection to the E1 (high) penella-Emissary subsystem and final treatment at the Quinta de Cima treatment plant, with discharge of the effluent to Rio Du...

8 July 2021

7 July 2021