Revision history of "Renewal of Water Supply Networks in Baixa in the municipality of Santa Cruz" (Q2982678)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:4919:49, 3 August 2022DG Regio talk contribs 41,214 bytes +25,399 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:2908:29, 9 July 2021DG Regio talk contribs 8,488 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1102:11, 9 July 2021DG Regio talk contribs 8,057 bytes +1,215 Created claim: summary (P836): Having identified hydraulic malfunction of the water supply networks in the municipality of Santa Cruz, it is intended with this operation to renew the oldest pipelines in the municipality, consisting of obsolete and inadequate materials, and the increase of its capacity, in order to meet current consumption in the municipality, reducing water losses and maintenance costs of these networks., translated_summary
  • curprev 02:1102:11, 9 July 2021DG Regio talk contribs 6,842 bytes −1,215 Removed claim: summary (P836): Having identified hydraulic malfunction of the water supply networks in the municipality of Santa Cruz, it is intended with this operation to renew the oldest pipelines in the municipality, consisting of obsolete and inadequate materials, and the increase of its capacity, in order to meet current consumption in the municipality, reducing water losses and maintenance costs of these networks., remove_old_english_translation
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 8,057 bytes +134 Changed label, description and/or aliases in en: translated_label
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 7,923 bytes +1,215 Created claim: summary (P836): Having identified hydraulic malfunction of the water supply networks in the municipality of Santa Cruz, it is intended with this operation to renew the oldest pipelines in the municipality, consisting of obsolete and inadequate materials, and the increase of its capacity, in order to meet current consumption in the municipality, reducing water losses and maintenance costs of these networks., translated_summary

7 July 2021