Revision history of "Public Drainage of Wastewater of Gouveia" (Q2982626)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:4819:48, 3 August 2022DG Regio talk contribs 41,556 bytes +25,038 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:2808:28, 9 July 2021DG Regio talk contribs 9,431 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 9,000 bytes +1,243 Created claim: summary (P836): The present project refers to the closure of the SAR network in the village of Gouveia (Continas and Polins area), with treatment at the Nespereira treatment plant (Gestão em Alta). It is planned to: (i) Construction of two lift stations (ii) Construction of a network of collectors and emissaries and (iii) restoration of accessibility. The project contributes to the addition of 178 people connected to the SAR system., translated_summary
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 7,757 bytes −1,243 Removed claim: summary (P836): The present project refers to the closure of the SAR network in the village of Gouveia (Continas and Polins area), with treatment at the Nespereira treatment plant (Gestão em Alta). It is planned to: (i) Construction of two lift stations (ii) Construction of a network of collectors and emissaries and (iii) restoration of accessibility. The project contributes to the addition of 178 people connected to the SAR system., remove_old_english_transl...
  • curprev 02:0902:09, 9 July 2021DG Regio talk contribs 9,000 bytes +99 Changed label, description and/or aliases in en: translated_label
  • curprev 02:0902:09, 9 July 2021DG Regio talk contribs 8,901 bytes +1,243 Created claim: summary (P836): The present project refers to the closure of the SAR network in the village of Gouveia (Continas and Polins area), with treatment at the Nespereira treatment plant (Gestão em Alta). It is planned to: (i) Construction of two lift stations (ii) Construction of a network of collectors and emissaries and (iii) restoration of accessibility. The project contributes to the addition of 178 people connected to the SAR system., translated_summary

8 July 2021

7 July 2021