Revision history of "Public Drainage of Residual Waters of Vila Franca da Serra" (Q2982624)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:4819:48, 3 August 2022DG Regio talk contribs 42,012 bytes +25,363 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:2808:28, 9 July 2021DG Regio talk contribs 9,385 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 8,954 bytes +1,232 Created claim: summary (P836): The project to be implemented in the village of Vila Franca da Serra, aims to increase the degree of treatment to which waste water is currently subjected in the existing septic tank, through the installation of a sewage treatment plant with secondary treatment and to readjust the drainage networks and collectors to this solution, with the installation of an Elevatory Station and about 1000 m of collectors., translated_summary
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 7,722 bytes −1,232 Removed claim: summary (P836): The project to be implemented in the village of Vila Franca da Serra, aims to increase the degree of treatment to which waste water is currently subjected in the existing septic tank, through the installation of a sewage treatment plant with secondary treatment and to readjust the drainage networks and collectors to this solution, with the installation of an Elevatory Station and about 1000 m of collectors., remove_old_english_translation
  • curprev 02:0902:09, 9 July 2021DG Regio talk contribs 8,954 bytes +117 Changed label, description and/or aliases in en: translated_label
  • curprev 02:0902:09, 9 July 2021DG Regio talk contribs 8,837 bytes +1,232 Created claim: summary (P836): The project to be implemented in the village of Vila Franca da Serra, aims to increase the degree of treatment to which waste water is currently subjected in the existing septic tank, through the installation of a sewage treatment plant with secondary treatment and to readjust the drainage networks and collectors to this solution, with the installation of an Elevatory Station and about 1000 m of collectors., translated_summary

8 July 2021

7 July 2021