Revision history of "Public Drainage and Wastewater Treatment of Figueiró da Serra" (Q2982623)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:4819:48, 3 August 2022DG Regio talk contribs 38,897 bytes +23,157 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:2808:28, 9 July 2021DG Regio talk contribs 9,198 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 8,767 bytes +1,103 Created claim: summary (P836): The project of the Public Drainage and Wastewater Treatment of Figueiró da Serra, to be implemented in the locality of Figueiró da Serra, emerges with a view to the readjustment of the drainage network of this locality, complying with the standards of discharge of the effluents., translated_summary
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 7,664 bytes −1,103 Removed claim: summary (P836): The project of the Public Drainage and Wastewater Treatment of Figueiró da Serra, to be implemented in the locality of Figueiró da Serra, emerges with a view to the readjustment of the drainage network of this locality, complying with the standards of discharge of the effluents., remove_old_english_translation
  • curprev 02:0902:09, 9 July 2021DG Regio talk contribs 8,767 bytes +121 Changed label, description and/or aliases in en: translated_label
  • curprev 02:0902:09, 9 July 2021DG Regio talk contribs 8,646 bytes +1,103 Created claim: summary (P836): The project of the Public Drainage and Wastewater Treatment of Figueiró da Serra, to be implemented in the locality of Figueiró da Serra, emerges with a view to the readjustment of the drainage network of this locality, complying with the standards of discharge of the effluents., translated_summary

8 July 2021

7 July 2021