Revision history of "Public Drainage of Waste Waters of Folgosinho" (Q2982622)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:4819:48, 3 August 2022DG Regio talk contribs 41,820 bytes +25,242 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:2808:28, 9 July 2021DG Regio talk contribs 9,412 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 8,981 bytes +1,245 Created claim: summary (P836): The present project refers to the closure of the SAR network in the village of Folgosinho. The recommended technical solutions involve: (i) Construction of lift station (ii) Construction of pressure operating emissary (iii) Lifting of the existing sidewalk and its replacement. In terms of population in the area of influence of the project, the project contributes to the addition of 70 people connected to the SAR system., translated_summary
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 7,736 bytes −1,245 Removed claim: summary (P836): The present project refers to the closure of the SAR network in the village of Folgosinho. The recommended technical solutions involve: (i) Construction of lift station (ii) Construction of pressure operating emissary (iii) Lifting of the existing sidewalk and its replacement. In terms of population in the area of influence of the project, the project contributes to the addition of 70 people connected to the SAR system., remove_old_english_tra...
  • curprev 02:0902:09, 9 July 2021DG Regio talk contribs 8,981 bytes +104 Changed label, description and/or aliases in en: translated_label
  • curprev 02:0902:09, 9 July 2021DG Regio talk contribs 8,877 bytes +1,245 Created claim: summary (P836): The present project refers to the closure of the SAR network in the village of Folgosinho. The recommended technical solutions involve: (i) Construction of lift station (ii) Construction of pressure operating emissary (iii) Lifting of the existing sidewalk and its replacement. In terms of population in the area of influence of the project, the project contributes to the addition of 70 people connected to the SAR system., translated_summary

8 July 2021

7 July 2021