Revision history of "Works at the Water Treatment Station of the Foundation" (Q2982602)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:4719:47, 3 August 2022DG Regio talk contribs 42,942 bytes +26,117 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:2808:28, 9 July 2021DG Regio talk contribs 9,462 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 9,031 bytes +1,256 Created claim: summary (P836): The operation consists of an intervention to replace three existing treatment points, inefficient and with operational risks, by only one sewage treatment plant, and adaptation of the sanitation network, in order to achieve greater optimisation of resources, ensuring the quality of the service provided to the populations and the sustainability of the systems in the urban water treatment, maximising compliance with the regulations., translated_su...
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 7,775 bytes −1,256 Removed claim: summary (P836): The operation consists of an intervention to replace three existing treatment points, inefficient and with operational risks, by only one sewage treatment plant, and adaptation of the sanitation network, in order to achieve greater optimisation of resources, ensuring the quality of the service provided to the populations and the sustainability of the systems in the urban water treatment, maximising compliance with the regulations., remove_old_...
  • curprev 02:0302:03, 9 July 2021DG Regio talk contribs 9,031 bytes +113 Changed label, description and/or aliases in en: translated_label
  • curprev 02:0302:03, 9 July 2021DG Regio talk contribs 8,918 bytes +1,256 Created claim: summary (P836): The operation consists of an intervention to replace three existing treatment points, inefficient and with operational risks, by only one sewage treatment plant, and adaptation of the sanitation network, in order to achieve greater optimisation of resources, ensuring the quality of the service provided to the populations and the sustainability of the systems in the urban water treatment, maximising compliance with the regulations., translated_su...

8 July 2021

7 July 2021