Revision history of "Remodeling of the Benlhevai SAR" (Q2982600)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:4719:47, 3 August 2022DG Regio talk contribs 40,948 bytes +24,854 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:2808:28, 9 July 2021DG Regio talk contribs 9,235 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 8,804 bytes +1,183 Created claim: summary (P836): The Remodeling of the Benlhevai treatment plant will gravitically drain the tributaries of the current Benlhevai sewage treatment plant. The main objective of this treatment plant is to satisfactorily treat all urban waste water in Benlhevai, providing it with a satisfactory system of waste water treatment, thus producing environmental and social added value., translated_summary
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 7,621 bytes −1,183 Removed claim: summary (P836): The Remodeling of the Benlhevai treatment plant will gravitically drain the tributaries of the current Benlhevai sewage treatment plant. The main objective of this treatment plant is to satisfactorily treat all urban waste water in Benlhevai, providing it with a satisfactory system of waste water treatment, thus producing environmental and social added value., remove_old_english_translation
  • curprev 02:0302:03, 9 July 2021DG Regio talk contribs 8,804 bytes +90 Changed label, description and/or aliases in en: translated_label
  • curprev 02:0202:02, 9 July 2021DG Regio talk contribs 8,714 bytes +1,183 Created claim: summary (P836): The Remodeling of the Benlhevai treatment plant will gravitically drain the tributaries of the current Benlhevai sewage treatment plant. The main objective of this treatment plant is to satisfactorily treat all urban waste water in Benlhevai, providing it with a satisfactory system of waste water treatment, thus producing environmental and social added value., translated_summary

8 July 2021

7 July 2021