Revision history of "Works at Carrascal Water Treatment Station" (Q2982580)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:4719:47, 3 August 2022DG Regio talk contribs 42,498 bytes +25,748 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:3608:36, 9 July 2021DG Regio talk contribs 9,422 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 8,991 bytes +1,257 Created claim: summary (P836): The operation aims at the rehabilitation of a sewage treatment plant, in order to maximise compliance with the regulations, ensuring greater intervention in the field of environmental protection, especially at the level of water bodies, and contributing to the optimisation of existing resources and infrastructure, ensuring the quality of the service provided to the population and the sustainability of urban water treatment systems., translated_s...
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 7,734 bytes −1,257 Removed claim: summary (P836): The operation aims at the rehabilitation of a sewage treatment plant, in order to maximise compliance with the regulations, ensuring greater intervention in the field of environmental protection, especially at the level of water bodies, and contributing to the optimisation of existing resources and infrastructure, ensuring the quality of the service provided to the population and the sustainability of urban water treatment systems., remove_old...
  • curprev 02:0002:00, 9 July 2021DG Regio talk contribs 8,991 bytes +101 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5901:59, 9 July 2021DG Regio talk contribs 8,890 bytes +1,257 Created claim: summary (P836): The operation aims at the rehabilitation of a sewage treatment plant, in order to maximise compliance with the regulations, ensuring greater intervention in the field of environmental protection, especially at the level of water bodies, and contributing to the optimisation of existing resources and infrastructure, ensuring the quality of the service provided to the population and the sustainability of urban water treatment systems., translated_s...

8 July 2021

7 July 2021