Revision history of "Restructuring of Wastewater Treatment Systems of the Municipality of Carregal do Sal – Currelos Subsystem" (Q2982557)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:4619:46, 3 August 2022DG Regio talk contribs 41,681 bytes +25,122 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:3608:36, 9 July 2021DG Regio talk contribs 9,410 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 8,979 bytes +1,162 Created claim: summary (P836): The operation itself involves the execution of Elevatory Stations, Lifting Conducts, Gravitic Conducts, WATER and respective access to new infrastructures. To better summarise the operation, the implementation project was subdivided into three headings: Wastewater drainage system Wastewater Treatment Station – Wastewater Treatment Plant, translated_summary
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 7,817 bytes −1,162 Removed claim: summary (P836): The operation itself involves the execution of Elevatory Stations, Lifting Conducts, Gravitic Conducts, WATER and respective access to new infrastructures. To better summarise the operation, the implementation project was subdivided into three headings: Wastewater drainage system Wastewater Treatment Station – Wastewater Treatment Plant, remove_old_english_translation
  • curprev 01:5901:59, 9 July 2021DG Regio talk contribs 8,979 bytes +167 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5901:59, 9 July 2021DG Regio talk contribs 8,812 bytes +1,162 Created claim: summary (P836): The operation itself involves the execution of Elevatory Stations, Lifting Conducts, Gravitic Conducts, WATER and respective access to new infrastructures. To better summarise the operation, the implementation project was subdivided into three headings: Wastewater drainage system Wastewater Treatment Station – Wastewater Treatment Plant, translated_summary

8 July 2021

7 July 2021