Revision history of "Drainage subsystem of Lamarosa (Lamarosa and Árgea)" (Q2982541)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:4519:45, 3 August 2022DG Regio talk contribs 42,883 bytes +26,035 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:3608:36, 9 July 2021DG Regio talk contribs 9,489 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0702:07, 9 July 2021DG Regio talk contribs 9,058 bytes +1,249 Created claim: summary (P836): The operation aims to provide the villages of Árgea and Lamarosa with a system for collecting, transporting and treating domestic waste water for 966 p.c., where currently there are already low but untreated networks associated with direct discharges to the water lines. To this end, a sewage treatment plant and the infrastructure necessary for the integration of existing networks (interceptors, lift systems) will be built., translated_summary
  • curprev 02:0702:07, 9 July 2021DG Regio talk contribs 7,809 bytes −1,249 Removed claim: summary (P836): The operation aims to provide the villages of Árgea and Lamarosa with a system for collecting, transporting and treating domestic waste water for 966 p.c., where currently there are already low but untreated networks associated with direct discharges to the water lines. To this end, a sewage treatment plant and the infrastructure necessary for the integration of existing networks (interceptors, lift systems) will be built., remove_old_english_...
  • curprev 01:5801:58, 9 July 2021DG Regio talk contribs 9,058 bytes +111 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5801:58, 9 July 2021DG Regio talk contribs 8,947 bytes +1,249 Created claim: summary (P836): The operation aims to provide the villages of Árgea and Lamarosa with a system for collecting, transporting and treating domestic waste water for 966 p.c., where currently there are already low but untreated networks associated with direct discharges to the water lines. To this end, a sewage treatment plant and the infrastructure necessary for the integration of existing networks (interceptors, lift systems) will be built., translated_summary

8 July 2021

7 July 2021