Revision history of "ETA da Ribeira Brava Expanding the Treatment Capacity" (Q2982534)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:4519:45, 3 August 2022DG Regio talk contribs 42,714 bytes +25,943 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:3608:36, 9 July 2021DG Regio talk contribs 9,476 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0702:07, 9 July 2021DG Regio talk contribs 9,045 bytes +1,261 Created claim: summary (P836): The operations of the operation, briefly, are as follows:i. Construction of a new treatment line as well as a system of ultraviolet disinfection for the two lines ii. Monitoring, measurement and regulation of flows from the various origins and phases of the system iii. Modernisation of the control system and its interconnection with the Telemanagement system (iv). Construction of a new pipeline while maintaining the existing connection, translat...
  • curprev 02:0702:07, 9 July 2021DG Regio talk contribs 7,784 bytes −1,261 Removed claim: summary (P836): The operations of the operation, briefly, are as follows:i. Construction of a new treatment line as well as a system of ultraviolet disinfection for the two lines ii. Monitoring, measurement and regulation of flows from the various origins and phases of the system iii. Modernisation of the control system and its interconnection with the Telemanagement system (iv). Construction of a new pipeline while maintaining the existing connection, remove...
  • curprev 01:5801:58, 9 July 2021DG Regio talk contribs 9,045 bytes +112 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5801:58, 9 July 2021DG Regio talk contribs 8,933 bytes +1,261 Created claim: summary (P836): The operations of the operation, briefly, are as follows:i. Construction of a new treatment line as well as a system of ultraviolet disinfection for the two lines ii. Monitoring, measurement and regulation of flows from the various origins and phases of the system iii. Modernisation of the control system and its interconnection with the Telemanagement system (iv). Construction of a new pipeline while maintaining the existing connection, translat...

8 July 2021

7 July 2021