Revision history of "Expansion of the water supply system of Campo Redondo – Foros dos Vales e Caeiros da Fontinha" (Q2982526)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

10 June 2023

23 May 2023

4 November 2022

3 August 2022

  • curprev 19:4519:45, 3 August 2022DG Regio talk contribs 39,741 bytes +23,653 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

20 October 2021

15 September 2021

9 July 2021

  • curprev 08:3608:36, 9 July 2021DG Regio talk contribs 9,215 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0702:07, 9 July 2021DG Regio talk contribs 8,784 bytes +1,109 Created claim: summary (P836): The work to be carried out consists of the construction of a set of distribution pipelines that will connect the water supply system of the locality of Campo Redondo to the places of Foros dos Vales and Caeiros da Fontinha and the supply branches to connect the dwellings to the network., translated_summary
  • curprev 02:0702:07, 9 July 2021DG Regio talk contribs 7,675 bytes −1,109 Removed claim: summary (P836): The work to be carried out consists of the construction of a set of distribution pipelines that will connect the water supply system of the locality of Campo Redondo to the places of Foros dos Vales and Caeiros da Fontinha and the supply branches to connect the dwellings to the network., remove_old_english_translation
  • curprev 01:5801:58, 9 July 2021DG Regio talk contribs 8,784 bytes +154 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5801:58, 9 July 2021DG Regio talk contribs 8,630 bytes +1,109 Created claim: summary (P836): The work to be carried out consists of the construction of a set of distribution pipelines that will connect the water supply system of the locality of Campo Redondo to the places of Foros dos Vales and Caeiros da Fontinha and the supply branches to connect the dwellings to the network., translated_summary

8 July 2021

7 July 2021