Revision history of "Drainage network of the places of Outeiro da Cruz, Moutinhas, Shipping and Barrigueira" (Q2982507)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:4519:45, 3 August 2022DG Regio talk contribs 41,855 bytes +25,174 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:4308:43, 9 July 2021DG Regio talk contribs 9,482 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0702:07, 9 July 2021DG Regio talk contribs 9,051 bytes +1,208 Created claim: summary (P836): The operation consists of the construction of wastewater drainage infrastructures, downtown, in the places of Outeiro da Cruz, Moutinhas, Remessa and Barrigueira, of the Union of Freguesias of Santiago de Litém, S. Simão de Litém and Albergaria dos Doze, whose physical and financial autonomy will be ensured through a totally gravity network, which will drain to the ETAR of Pombal., translated_summary
  • curprev 02:0702:07, 9 July 2021DG Regio talk contribs 7,843 bytes −1,208 Removed claim: summary (P836): The operation consists of the construction of wastewater drainage infrastructures, downtown, in the places of Outeiro da Cruz, Moutinhas, Remessa and Barrigueira, of the Union of Freguesias of Santiago de Litém, S. Simão de Litém and Albergaria dos Doze, whose physical and financial autonomy will be ensured through a totally gravity network, which will drain to the ETAR of Pombal., remove_old_english_translation
  • curprev 01:5201:52, 9 July 2021DG Regio talk contribs 9,051 bytes +145 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5201:52, 9 July 2021DG Regio talk contribs 8,906 bytes +1,208 Created claim: summary (P836): The operation consists of the construction of wastewater drainage infrastructures, downtown, in the places of Outeiro da Cruz, Moutinhas, Remessa and Barrigueira, of the Union of Freguesias of Santiago de Litém, S. Simão de Litém and Albergaria dos Doze, whose physical and financial autonomy will be ensured through a totally gravity network, which will drain to the ETAR of Pombal., translated_summary

8 July 2021

7 July 2021