Revision history of "Extension of São Teotónio water supply system – Casa Nova da Cruz" (Q2982502)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

10 June 2023

23 May 2023

4 November 2022

3 August 2022

  • curprev 19:4519:45, 3 August 2022DG Regio talk contribs 44,700 bytes +27,331 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

20 October 2021

15 September 2021

9 July 2021

  • curprev 08:4308:43, 9 July 2021DG Regio talk contribs 9,613 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0702:07, 9 July 2021DG Regio talk contribs 9,182 bytes +1,335 Created claim: summary (P836): The operation is part of the connection of the existing network in the village of Casa Nova da Cruz, whose supply is made from an uncontrolled origin to the distribution network of S. Teotónio. For this purpose, it is expected that the pipeline to be installed will be connected in the area of the Sobreirinho to the existing pipeline originating in the deposit of the Derrouca where the general supply node will be executed for the new pipeline tha...
  • curprev 02:0702:07, 9 July 2021DG Regio talk contribs 7,847 bytes −1,335 Removed claim: summary (P836): The operation is part of the connection of the existing network in the village of Casa Nova da Cruz, whose supply is made from an uncontrolled origin to the distribution network of S. Teotónio. For this purpose, it is expected that the pipeline to be installed will be connected in the area of the Sobreirinho to the existing pipeline originating in the deposit of the Derrouca where the general supply node will be executed for the new pipeline t...
  • curprev 01:5201:52, 9 July 2021DG Regio talk contribs 9,182 bytes +128 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5201:52, 9 July 2021DG Regio talk contribs 9,054 bytes +1,335 Created claim: summary (P836): The operation is part of the connection of the existing network in the village of Casa Nova da Cruz, whose supply is made from an uncontrolled origin to the distribution network of S. Teotónio. For this purpose, it is expected that the pipeline to be installed will be connected in the area of the Sobreirinho to the existing pipeline originating in the deposit of the Derrouca where the general supply node will be executed for the new pipeline tha...

8 July 2021

7 July 2021