Revision history of "Extension of the Water Supply Network in the Municipality of Penela" (Q2982493)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:4419:44, 3 August 2022DG Regio talk contribs 41,965 bytes +25,122 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:2708:27, 9 July 2021DG Regio talk contribs 9,455 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 9,024 bytes +1,246 Created claim: summary (P836): The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high., translated_summary
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 7,778 bytes −1,246 Removed claim: summary (P836): The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high., remove_old_english_tran...
  • curprev 01:5201:52, 9 July 2021DG Regio talk contribs 9,024 bytes +126 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5201:52, 9 July 2021DG Regio talk contribs 8,898 bytes +1,246 Created claim: summary (P836): The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high., translated_summary

8 July 2021

7 July 2021