Revision history of "Miranda do Douro Water Supply System – North Sector" (Q2982472)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:4419:44, 3 August 2022DG Regio talk contribs 42,808 bytes +25,941 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:2708:27, 9 July 2021DG Regio talk contribs 9,459 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 9,028 bytes +1,247 Created claim: summary (P836): The operation aims to optimise the water supply service in the Northern Sector of Miranda do Douro, boosting the installed capacity down through the closure of systems concluding the high-low connections, with closure of inefficient own captures and connection of the networks of the agglomerates to the Miranda ETA, for the improvement of the supply service in quality (better treatment) and quantity (uninterrupted supply)., translated_summary
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 7,781 bytes −1,247 Removed claim: summary (P836): The operation aims to optimise the water supply service in the Northern Sector of Miranda do Douro, boosting the installed capacity down through the closure of systems concluding the high-low connections, with closure of inefficient own captures and connection of the networks of the agglomerates to the Miranda ETA, for the improvement of the supply service in quality (better treatment) and quantity (uninterrupted supply)., remove_old_english_t...
  • curprev 01:5201:52, 9 July 2021DG Regio talk contribs 9,028 bytes +112 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5201:52, 9 July 2021DG Regio talk contribs 8,916 bytes +1,247 Created claim: summary (P836): The operation aims to optimise the water supply service in the Northern Sector of Miranda do Douro, boosting the installed capacity down through the closure of systems concluding the high-low connections, with closure of inefficient own captures and connection of the networks of the agglomerates to the Miranda ETA, for the improvement of the supply service in quality (better treatment) and quantity (uninterrupted supply)., translated_summary

8 July 2021

7 July 2021