Revision history of "Water supply to the South Zone of the Freguesias de Roge, Macieira de Cambra and S. Pedro de Castelões" (Q2982455)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:4319:43, 3 August 2022DG Regio talk contribs 42,482 bytes +25,646 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:2608:26, 9 July 2021DG Regio talk contribs 9,476 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 9,045 bytes +1,207 Created claim: summary (P836): The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents., translated_summary
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 7,838 bytes −1,207 Removed claim: summary (P836): The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents., remove_old_english_translation
  • curprev 01:5101:51, 9 July 2021DG Regio talk contribs 9,045 bytes +163 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5101:51, 9 July 2021DG Regio talk contribs 8,882 bytes +1,207 Created claim: summary (P836): The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents., translated_summary

8 July 2021

7 July 2021