Revision history of "Alcorochel Sewage Subsystem" (Q2982447)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 June 2023

23 May 2023

9 November 2022

3 August 2022

  • curprev 19:4319:43, 3 August 2022DG Regio talk contribs 43,092 bytes +26,801 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:2608:26, 9 July 2021DG Regio talk contribs 8,594 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 8,163 bytes +1,282 Created claim: summary (P836): The place of Alcorochel is served by a drainage network without providing adequate treatment due to lack of sewage treatment. The aim is to build a sewage treatment plant, two lifting systems and collectors for linking new infrastructures with existing ones. An appropriate system of collection, drainage and treatment of waste water will thus be achieved, reducing urban pollution in the body of water associated with the system (Rio Alviela – PT05...
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 6,881 bytes −1,282 Removed claim: summary (P836): The place of Alcorochel is served by a drainage network without providing adequate treatment due to lack of sewage treatment. The aim is to build a sewage treatment plant, two lifting systems and collectors for linking new infrastructures with existing ones. An appropriate system of collection, drainage and treatment of waste water will thus be achieved, reducing urban pollution in the body of water associated with the system (Rio Alviela – PT...
  • curprev 01:5101:51, 9 July 2021DG Regio talk contribs 8,163 bytes +86 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5101:51, 9 July 2021DG Regio talk contribs 8,077 bytes +1,282 Created claim: summary (P836): The place of Alcorochel is served by a drainage network without providing adequate treatment due to lack of sewage treatment. The aim is to build a sewage treatment plant, two lifting systems and collectors for linking new infrastructures with existing ones. An appropriate system of collection, drainage and treatment of waste water will thus be achieved, reducing urban pollution in the body of water associated with the system (Rio Alviela – PT05...

7 July 2021