Revision history of "Extension of the Wastewater Sanitation Network of the Vila Arcos de Valdevez Subsystem" (Q2982431)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:4219:42, 3 August 2022DG Regio talk contribs 39,087 bytes +23,164 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:2608:26, 9 July 2021DG Regio talk contribs 9,305 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0502:05, 9 July 2021DG Regio talk contribs 8,874 bytes +1,097 Created claim: summary (P836): The measures provided for in this operation will contribute to the optimisation of the installed capacity utilisation of the Residual Water Treatment Plant of Valdevez Arcos, as well as to improve the quality of service of the wastewater sewage networks of this municipality., translated_summary
  • curprev 02:0502:05, 9 July 2021DG Regio talk contribs 7,777 bytes −1,097 Removed claim: summary (P836): The measures provided for in this operation will contribute to the optimisation of the installed capacity utilisation of the Residual Water Treatment Plant of Valdevez Arcos, as well as to improve the quality of service of the wastewater sewage networks of this municipality., remove_old_english_translation
  • curprev 01:5001:50, 9 July 2021DG Regio talk contribs 8,874 bytes +145 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5001:50, 9 July 2021DG Regio talk contribs 8,729 bytes +1,097 Created claim: summary (P836): The measures provided for in this operation will contribute to the optimisation of the installed capacity utilisation of the Residual Water Treatment Plant of Valdevez Arcos, as well as to improve the quality of service of the wastewater sewage networks of this municipality., translated_summary

8 July 2021

7 July 2021