Revision history of "Water supply infrastructure in Castro Marim: Central subsystem" (Q2982415)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:4219:42, 3 August 2022DG Regio talk contribs 43,421 bytes +26,267 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

20 October 2021

15 September 2021

9 July 2021

  • curprev 08:2608:26, 9 July 2021DG Regio talk contribs 9,531 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0402:04, 9 July 2021DG Regio talk contribs 9,100 bytes +1,279 Created claim: summary (P836): The present operation consists of the implementation of the Central Water Supply Subsystem of the municipality of Castro Marim, which will allow the supply of water in quantity and quality to the populations not yet served.The intervention will allow the articulation between the slope in high and the lower slope, configuring the municipal infrastructure in order to allow the effective connection to the Multimunicipal Water Supply Systems of the...
  • curprev 02:0402:04, 9 July 2021DG Regio talk contribs 7,821 bytes −1,279 Removed claim: summary (P836): The present operation consists of the implementation of the Central Water Supply Subsystem of the municipality of Castro Marim, which will allow the supply of water in quantity and quality to the populations not yet served.The intervention will allow the articulation between the slope in high and the lower slope, configuring the municipal infrastructure in order to allow the effective connection to the Multimunicipal Water Supply Systems of th...
  • curprev 01:5801:58, 9 July 2021DG Regio talk contribs 9,100 bytes +121 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5801:58, 9 July 2021DG Regio talk contribs 8,979 bytes +1,279 Created claim: summary (P836): The present operation consists of the implementation of the Central Water Supply Subsystem of the municipality of Castro Marim, which will allow the supply of water in quantity and quality to the populations not yet served.The intervention will allow the articulation between the slope in high and the lower slope, configuring the municipal infrastructure in order to allow the effective connection to the Multimunicipal Water Supply Systems of the...

8 July 2021

7 July 2021