Revision history of "WASTEWATER DRAINAGE NETWORK – RIBEIRA DO MILL" (Q2982412)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

9 November 2022

3 August 2022

  • curprev 19:4219:42, 3 August 2022DG Regio talk contribs 41,775 bytes +25,162 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:2608:26, 9 July 2021DG Regio talk contribs 9,476 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0402:04, 9 July 2021DG Regio talk contribs 9,045 bytes +1,248 Created claim: summary (P836): The project of the Drainage Network of Wastewater Ribeira do Moinho, comes with a view to the elimination of the septic tanks and the existing wells in Ferreira, Avessada, Vale de Gião, Fund of Vila and extension of the service in Vale de Gião and Lomba.In the scope of this intervention, the implementation of collectors, lifting stations (EE) and respective pipelines as well as the placement of visiting boxes is planned., translated_summary
  • curprev 02:0402:04, 9 July 2021DG Regio talk contribs 7,797 bytes −1,248 Removed claim: summary (P836): The project of the Drainage Network of Wastewater Ribeira do Moinho, comes with a view to the elimination of the septic tanks and the existing wells in Ferreira, Avessada, Vale de Gião, Fund of Vila and extension of the service in Vale de Gião and Lomba.In the scope of this intervention, the implementation of collectors, lifting stations (EE) and respective pipelines as well as the placement of visiting boxes is planned., remove_old_english_tr...
  • curprev 01:5801:58, 9 July 2021DG Regio talk contribs 9,045 bytes +106 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5801:58, 9 July 2021DG Regio talk contribs 8,939 bytes +1,248 Created claim: summary (P836): The project of the Drainage Network of Wastewater Ribeira do Moinho, comes with a view to the elimination of the septic tanks and the existing wells in Ferreira, Avessada, Vale de Gião, Fund of Vila and extension of the service in Vale de Gião and Lomba.In the scope of this intervention, the implementation of collectors, lifting stations (EE) and respective pipelines as well as the placement of visiting boxes is planned., translated_summary

8 July 2021

7 July 2021