Revision history of "Water network the Várzea of Man" (Q2982375)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

10 June 2023

23 May 2023

9 November 2022

3 August 2022

  • curprev 19:4119:41, 3 August 2022DG Regio talk contribs 37,394 bytes +22,018 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:5808:58, 9 July 2021DG Regio talk contribs 9,072 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5901:59, 9 July 2021DG Regio talk contribs 8,641 bytes +1,076 Created claim: summary (P836): The water distribution network to be designed for the Várzea do Homem will originate from the high reservoir in Borralhal. The new network starts from this point from a new picagem to be carried out in the reservoir, as indicated by the Planalto Waters., translated_summary
  • curprev 01:5901:59, 9 July 2021DG Regio talk contribs 7,565 bytes −1,076 Removed claim: summary (P836): The water distribution network to be designed for the Várzea do Homem will originate from the high reservoir in Borralhal. The new network starts from this point from a new picagem to be carried out in the reservoir, as indicated by the Planalto Waters., remove_old_english_translation
  • curprev 01:5701:57, 9 July 2021DG Regio talk contribs 8,641 bytes +91 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5701:57, 9 July 2021DG Regio talk contribs 8,550 bytes +1,076 Created claim: summary (P836): The water distribution network to be designed for the Várzea do Homem will originate from the high reservoir in Borralhal. The new network starts from this point from a new picagem to be carried out in the reservoir, as indicated by the Planalto Waters., translated_summary

8 July 2021

7 July 2021