Revision history of "Closure of Wastewater Sanitation Systems – Lagos Wastewater Treatment Plant" (Q2982374)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:4119:41, 3 August 2022DG Regio talk contribs 43,177 bytes +26,407 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

20 October 2021

15 September 2021

9 July 2021

  • curprev 08:5808:58, 9 July 2021DG Regio talk contribs 9,426 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5901:59, 9 July 2021DG Regio talk contribs 8,995 bytes +1,220 Created claim: summary (P836): With this operation, the Municipality of Lagos intends, on the one hand, to deactivate private septic tanks and to build the drainage network for forwarding the sewage to the upstream system and, on the other, to the deactivation of collective urbanisation tanks to connect to the high water treatment plant of Lagos. The overall budgeted cost for the four interventions is EUR 676,034.32 plus VAT., translated_summary
  • curprev 01:5901:59, 9 July 2021DG Regio talk contribs 7,775 bytes −1,220 Removed claim: summary (P836): With this operation, the Municipality of Lagos intends, on the one hand, to deactivate private septic tanks and to build the drainage network for forwarding the sewage to the upstream system and, on the other, to the deactivation of collective urbanisation tanks to connect to the high water treatment plant of Lagos. The overall budgeted cost for the four interventions is EUR 676,034.32 plus VAT., remove_old_english_translation
  • curprev 01:5701:57, 9 July 2021DG Regio talk contribs 8,995 bytes +136 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5701:57, 9 July 2021DG Regio talk contribs 8,859 bytes +1,220 Created claim: summary (P836): With this operation, the Municipality of Lagos intends, on the one hand, to deactivate private septic tanks and to build the drainage network for forwarding the sewage to the upstream system and, on the other, to the deactivation of collective urbanisation tanks to connect to the high water treatment plant of Lagos. The overall budgeted cost for the four interventions is EUR 676,034.32 plus VAT., translated_summary

8 July 2021

7 July 2021