Revision history of "EXTENSION OF THE WATER SUPPLY NETWORK OF THE NORTHERN SECTOR, VILLAGE AND SOUTHWEST SUBSYSTEM" (Q2982304)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:3919:39, 3 August 2022DG Regio talk contribs 44,368 bytes +27,027 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:5808:58, 9 July 2021DG Regio talk contribs 9,640 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5801:58, 9 July 2021DG Regio talk contribs 9,209 bytes +1,261 Created claim: summary (P836): It aims to close down water supply systems, with a view to optimising the installed capacity and adhesion to the service, through the execution of connections between the system at high managed by the Águas do Norte and lower by the municipality of Arcos de Valdevez, allowing the extension of the service, in the area of influence of the system, to populations that are not yet served and have precarious solutions to supply their homes., translate...
  • curprev 01:5801:58, 9 July 2021DG Regio talk contribs 7,948 bytes −1,261 Removed claim: summary (P836): It aims to close down water supply systems, with a view to optimising the installed capacity and adhesion to the service, through the execution of connections between the system at high managed by the Águas do Norte and lower by the municipality of Arcos de Valdevez, allowing the extension of the service, in the area of influence of the system, to populations that are not yet served and have precarious solutions to supply their homes., remove_...
  • curprev 01:4201:42, 9 July 2021DG Regio talk contribs 9,209 bytes +152 Changed label, description and/or aliases in en: translated_label
  • curprev 01:4201:42, 9 July 2021DG Regio talk contribs 9,057 bytes +1,261 Created claim: summary (P836): It aims to close down water supply systems, with a view to optimising the installed capacity and adhesion to the service, through the execution of connections between the system at high managed by the Águas do Norte and lower by the municipality of Arcos de Valdevez, allowing the extension of the service, in the area of influence of the system, to populations that are not yet served and have precarious solutions to supply their homes., translate...

8 July 2021

7 July 2021