Revision history of "Closure of the sewage system of Charneca" (Q2982289)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

10 June 2023

23 May 2023

9 November 2022

3 August 2022

  • curprev 19:3919:39, 3 August 2022DG Regio talk contribs 39,737 bytes +23,664 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:3908:39, 9 July 2021DG Regio talk contribs 9,172 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5701:57, 9 July 2021DG Regio talk contribs 8,741 bytes +1,116 Created claim: summary (P836): The operation aims to close the sewage system of Charneca, bearing in mind that some areas of this system are not yet linked to the upstream slope (the water catchment system of the Óbidos lagoon) as well as the extension of the service to populations not yet served in the area of the system., translated_summary
  • curprev 01:5701:57, 9 July 2021DG Regio talk contribs 7,625 bytes −1,116 Removed claim: summary (P836): The operation aims to close the sewage system of Charneca, bearing in mind that some areas of this system are not yet linked to the upstream slope (the water catchment system of the Óbidos lagoon) as well as the extension of the service to populations not yet served in the area of the system., remove_old_english_translation
  • curprev 01:4101:41, 9 July 2021DG Regio talk contribs 8,741 bytes +99 Changed label, description and/or aliases in en: translated_label
  • curprev 01:4101:41, 9 July 2021DG Regio talk contribs 8,642 bytes +1,116 Created claim: summary (P836): The operation aims to close the sewage system of Charneca, bearing in mind that some areas of this system are not yet linked to the upstream slope (the water catchment system of the Óbidos lagoon) as well as the extension of the service to populations not yet served in the area of the system., translated_summary

8 July 2021

7 July 2021