Revision history of "Execution of the High-Down Links at the SAR Sta Cruz do Douro" (Q2982276)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:3819:38, 3 August 2022DG Regio talk contribs 40,481 bytes +24,253 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:3908:39, 9 July 2021DG Regio talk contribs 9,372 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5701:57, 9 July 2021DG Regio talk contribs 8,941 bytes +1,175 Created claim: summary (P836): This operation aims to close down the SAR in the parish of Santa Cruz do Douro, in the municipality of Baião, with a view to optimising the use of installed capacity in the Subsystem of Residual Water of Santa Cruz do Douro and adhesion to the service, by providing the service to about 35 inhabitants, through the construction of 0.7 Km of AR network., translated_summary
  • curprev 01:5701:57, 9 July 2021DG Regio talk contribs 7,766 bytes −1,175 Removed claim: summary (P836): This operation aims to close down the SAR in the parish of Santa Cruz do Douro, in the municipality of Baião, with a view to optimising the use of installed capacity in the Subsystem of Residual Water of Santa Cruz do Douro and adhesion to the service, by providing the service to about 35 inhabitants, through the construction of 0.7 Km of AR network., remove_old_english_translation
  • curprev 01:3501:35, 9 July 2021DG Regio talk contribs 8,941 bytes +120 Changed label, description and/or aliases in en: translated_label
  • curprev 01:3501:35, 9 July 2021DG Regio talk contribs 8,821 bytes +1,175 Created claim: summary (P836): This operation aims to close down the SAR in the parish of Santa Cruz do Douro, in the municipality of Baião, with a view to optimising the use of installed capacity in the Subsystem of Residual Water of Santa Cruz do Douro and adhesion to the service, by providing the service to about 35 inhabitants, through the construction of 0.7 Km of AR network., translated_summary

8 July 2021

7 July 2021