Revision history of "Completion of the Residual Water Drainage Subsystem of Mezio Alguidar" (Q2982273)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:3819:38, 3 August 2022DG Regio talk contribs 39,848 bytes +23,894 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:3908:39, 9 July 2021DG Regio talk contribs 9,195 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5701:57, 9 July 2021DG Regio talk contribs 8,764 bytes +1,108 Created claim: summary (P836): The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem., translated_summary
  • curprev 01:5701:57, 9 July 2021DG Regio talk contribs 7,656 bytes −1,108 Removed claim: summary (P836): The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem., remove_old_english_translation
  • curprev 01:3501:35, 9 July 2021DG Regio talk contribs 8,764 bytes +128 Changed label, description and/or aliases in en: translated_label
  • curprev 01:3501:35, 9 July 2021DG Regio talk contribs 8,636 bytes +1,108 Created claim: summary (P836): The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem., translated_summary

8 July 2021

7 July 2021