Revision history of "Closure of SAR nets in the Alguidar do Ave – Municipality of Póvoa de Lanhoso" (Q2982231)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:3719:37, 3 August 2022DG Regio talk contribs 42,834 bytes +26,046 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:3808:38, 9 July 2021DG Regio talk contribs 9,414 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5601:56, 9 July 2021DG Regio talk contribs 8,983 bytes +1,219 Created claim: summary (P836): This is an infrastructural operation aimed at closing SAR networks in the parishes targeted by this operation, thus responding to an urgent need to give the appropriate destination to the effluents of these populations. These are interventions that must be carried out in order to meet the objectives set out in the PGBH of Cávado, Ave and Leça in terms of improving the quality of water bodies., translated_summary
  • curprev 01:5601:56, 9 July 2021DG Regio talk contribs 7,764 bytes −1,219 Removed claim: summary (P836): This is an infrastructural operation aimed at closing SAR networks in the parishes targeted by this operation, thus responding to an urgent need to give the appropriate destination to the effluents of these populations. These are interventions that must be carried out in order to meet the objectives set out in the PGBH of Cávado, Ave and Leça in terms of improving the quality of water bodies., remove_old_english_translation
  • curprev 01:3401:34, 9 July 2021DG Regio talk contribs 8,983 bytes +139 Changed label, description and/or aliases in en: translated_label
  • curprev 01:3401:34, 9 July 2021DG Regio talk contribs 8,844 bytes +1,219 Created claim: summary (P836): This is an infrastructural operation aimed at closing SAR networks in the parishes targeted by this operation, thus responding to an urgent need to give the appropriate destination to the effluents of these populations. These are interventions that must be carried out in order to meet the objectives set out in the PGBH of Cávado, Ave and Leça in terms of improving the quality of water bodies., translated_summary

8 July 2021

7 July 2021