Revision history of "Wastewater Sanitation System Emissaries from the parish of Covões à Ribeira de Sile and Pedra Basta à Zona Industrial" (Q2982205)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

10 June 2023

23 May 2023

4 November 2022

3 August 2022

  • curprev 19:3619:36, 3 August 2022DG Regio talk contribs 43,256 bytes +26,346 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

20 October 2021

15 September 2021

9 July 2021

  • curprev 08:3808:38, 9 July 2021DG Regio talk contribs 9,539 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5601:56, 9 July 2021DG Regio talk contribs 9,108 bytes +1,239 Created claim: summary (P836): The operation aims at the construction of two emissaries – one between the parish of Covões and Ribeira de Seda and the other between Pedra Basta and the Industrial Zone of Portalegre – in order to solve serious problems in the operation of existing infrastructures. This is an integrated solution that will lead to the increase of coverage, contributing to the maximisation of the treatment plant of Portalegre., translated_summary
  • curprev 01:5601:56, 9 July 2021DG Regio talk contribs 7,869 bytes −1,239 Removed claim: summary (P836): The operation aims at the construction of two emissaries – one between the parish of Covões and Ribeira de Seda and the other between Pedra Basta and the Industrial Zone of Portalegre – in order to solve serious problems in the operation of existing infrastructures. This is an integrated solution that will lead to the increase of coverage, contributing to the maximisation of the treatment plant of Portalegre., remove_old_english_translation
  • curprev 01:5501:55, 9 July 2021DG Regio talk contribs 9,108 bytes +180 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5501:55, 9 July 2021DG Regio talk contribs 8,928 bytes +1,239 Created claim: summary (P836): The operation aims at the construction of two emissaries – one between the parish of Covões and Ribeira de Seda and the other between Pedra Basta and the Industrial Zone of Portalegre – in order to solve serious problems in the operation of existing infrastructures. This is an integrated solution that will lead to the increase of coverage, contributing to the maximisation of the treatment plant of Portalegre., translated_summary

8 July 2021

7 July 2021