Revision history of "Extension of the Wastewater Sanitation Network – Freguesia de Cadima e Sanguinheira, Cantanhede" (Q2982144)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

10 June 2023

23 May 2023

9 November 2022

3 August 2022

  • curprev 19:3519:35, 3 August 2022DG Regio talk contribs 41,932 bytes +25,230 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:5908:59, 9 July 2021DG Regio talk contribs 9,473 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5401:54, 9 July 2021DG Regio talk contribs 9,042 bytes +1,177 Created claim: summary (P836): The solution for designing the operation comprises the construction of collection and emissary networks over a length of 9.5 km, 132 sewage branches, 2 sewage lifting stations and their lifting ducts with an approximate length of 0.4 km, and it is expected to serve 232 inhabitants (resident population), with a total investment cost of 798,717,11EURuros., translated_summary
  • curprev 01:5401:54, 9 July 2021DG Regio talk contribs 7,865 bytes −1,177 Removed claim: summary (P836): The solution for designing the operation comprises the construction of collection and emissary networks over a length of 9.5 km, 132 sewage branches, 2 sewage lifting stations and their lifting ducts with an approximate length of 0.4 km, and it is expected to serve 232 inhabitants (resident population), with a total investment cost of 798,717,11EURuros., remove_old_english_translation
  • curprev 01:5301:53, 9 July 2021DG Regio talk contribs 9,042 bytes +156 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5301:53, 9 July 2021DG Regio talk contribs 8,886 bytes +1,177 Created claim: summary (P836): The solution for designing the operation comprises the construction of collection and emissary networks over a length of 9.5 km, 132 sewage branches, 2 sewage lifting stations and their lifting ducts with an approximate length of 0.4 km, and it is expected to serve 232 inhabitants (resident population), with a total investment cost of 798,717,11EURuros., translated_summary

8 July 2021

7 July 2021