Revision history of "ELABORATION OF THE REGISTER OF INFRASTRUCTURES IN THE LOWER SYSTEMS OF THE MUNICIPALITY OF PENELA" (Q2982040)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

9 November 2022

3 August 2022

  • curprev 19:3219:32, 3 August 2022DG Regio talk contribs 42,191 bytes +25,510 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:2508:25, 9 July 2021DG Regio talk contribs 9,371 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5201:52, 9 July 2021DG Regio talk contribs 8,940 bytes +1,175 Created claim: summary (P836): The PM intends to carry out the cadastral survey of its entire water supply network (220 km) and the Wastewater Sanitation Network (30 km) aiming at a more efficient management of services, either by identifying the needs of future interventions, or by the introduction of control and information mechanisms that avoid losses and reduce operating costs., translated_summary
  • curprev 01:5201:52, 9 July 2021DG Regio talk contribs 7,765 bytes −1,175 Removed claim: summary (P836): The PM intends to carry out the cadastral survey of its entire water supply network (220 km) and the Wastewater Sanitation Network (30 km) aiming at a more efficient management of services, either by identifying the needs of future interventions, or by the introduction of control and information mechanisms that avoid losses and reduce operating costs., remove_old_english_translation
  • curprev 01:0901:09, 9 July 2021DG Regio talk contribs 8,940 bytes +156 Changed label, description and/or aliases in en: translated_label
  • curprev 01:0901:09, 9 July 2021DG Regio talk contribs 8,784 bytes +1,175 Created claim: summary (P836): The PM intends to carry out the cadastral survey of its entire water supply network (220 km) and the Wastewater Sanitation Network (30 km) aiming at a more efficient management of services, either by identifying the needs of future interventions, or by the introduction of control and information mechanisms that avoid losses and reduce operating costs., translated_summary

8 July 2021

7 July 2021