Revision history of "Acquisition of Heavy machinery and Vehicles for the installation of Forest Defense Networks against Fire – RDFCI_Maq" (Q2981780)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

23 May 2023

9 November 2022

3 August 2022

  • curprev 19:2519:25, 3 August 2022DG Regio talk contribs 42,908 bytes +26,992 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 09:0509:05, 9 July 2021DG Regio talk contribs 8,272 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:4601:46, 9 July 2021DG Regio talk contribs 7,841 bytes +1,234 Created claim: summary (P836): The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets., translated_summary
  • curprev 01:4601:46, 9 July 2021DG Regio talk contribs 6,607 bytes −1,234 Removed claim: summary (P836): The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets., remove_old_english_translation
  • curprev 01:0301:03, 9 July 2021DG Regio talk contribs 7,841 bytes +178 Changed label, description and/or aliases in en: translated_label
  • curprev 01:0301:03, 9 July 2021DG Regio talk contribs 7,663 bytes +1,234 Created claim: summary (P836): The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets., translated_summary

7 July 2021