Revision history of "INTEGRATED VIDEO SURVEILLANCE SYSTEMS FOR FOREST FIRE PREVENTION IN THE METROPOLITAN AREA OF PORTO" (Q2981771)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:2419:24, 3 August 2022DG Regio talk contribs 42,332 bytes +26,588 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 09:0509:05, 9 July 2021DG Regio talk contribs 8,244 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:4601:46, 9 July 2021DG Regio talk contribs 7,813 bytes +1,243 Created claim: summary (P836): The purpose of the system to be installed is to fill the identified gaps. Its design required the evaluation of a wide range of factors, such as the locations and coverage of the posts of the National Network of Watch Posts, the technical characteristics of the equipment, the geographical characteristics of each region that is intended to be covered, and the possibility of future integration with the neighboring MICs., translated_summary
  • curprev 01:4601:46, 9 July 2021DG Regio talk contribs 6,570 bytes −1,243 Removed claim: summary (P836): The purpose of the system to be installed is to fill the identified gaps. Its design required the evaluation of a wide range of factors, such as the locations and coverage of the posts of the National Network of Watch Posts, the technical characteristics of the equipment, the geographical characteristics of each region that is intended to be covered, and the possibility of future integration with the neighboring MICs., remove_old_english_trans...
  • curprev 01:0301:03, 9 July 2021DG Regio talk contribs 7,813 bytes +157 Changed label, description and/or aliases in en: translated_label
  • curprev 01:0301:03, 9 July 2021DG Regio talk contribs 7,656 bytes +1,243 Created claim: summary (P836): The purpose of the system to be installed is to fill the identified gaps. Its design required the evaluation of a wide range of factors, such as the locations and coverage of the posts of the National Network of Watch Posts, the technical characteristics of the equipment, the geographical characteristics of each region that is intended to be covered, and the possibility of future integration with the neighboring MICs., translated_summary

7 July 2021