Revision history of "Structural interventions and Flood Control on the Vouga and Antuã rivers" (Q2981745)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:2419:24, 3 August 2022DG Regio talk contribs 41,858 bytes +26,137 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 09:0509:05, 9 July 2021DG Regio talk contribs 8,167 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:4501:45, 9 July 2021DG Regio talk contribs 7,736 bytes +1,223 Created claim: summary (P836): The project aims to prevent flood and flood risks, recovering damaged marginal profiles in various locations along the banks of the Vouga and Antuã rivers, allowing an increase in flow capacity and flow section, as well as punctual regularisation of the marginal coronation quota. It also includes the construction of a new pontoon, raising the level of the new crowning quota of the banks’ slopes., translated_summary
  • curprev 01:4501:45, 9 July 2021DG Regio talk contribs 6,513 bytes −1,223 Removed claim: summary (P836): The project aims to prevent flood and flood risks, recovering damaged marginal profiles in various locations along the banks of the Vouga and Antuã rivers, allowing an increase in flow capacity and flow section, as well as punctual regularisation of the marginal coronation quota. It also includes the construction of a new pontoon, raising the level of the new crowning quota of the banks’ slopes., remove_old_english_translation
  • curprev 01:0201:02, 9 July 2021DG Regio talk contribs 7,736 bytes +132 Changed label, description and/or aliases in en: translated_label
  • curprev 01:0201:02, 9 July 2021DG Regio talk contribs 7,604 bytes +1,223 Created claim: summary (P836): The project aims to prevent flood and flood risks, recovering damaged marginal profiles in various locations along the banks of the Vouga and Antuã rivers, allowing an increase in flow capacity and flow section, as well as punctual regularisation of the marginal coronation quota. It also includes the construction of a new pontoon, raising the level of the new crowning quota of the banks’ slopes., translated_summary

7 July 2021