Revision history of "RISK MANAGEMENT AND FLOOD CONTROL IN THE WATER NETWORK AREA OF THE URBAN AREA OF NEW VILLAGE OF GAIA" (Q2981676)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:2119:21, 3 August 2022DG Regio talk contribs 39,950 bytes +23,632 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:5208:52, 9 July 2021DG Regio talk contribs 9,347 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0902:09, 9 July 2021DG Regio talk contribs 8,916 bytes +1,118 Created claim: summary (P836): The present application consists of the execution of the constructions of Retention of the Horto River, Alguidar de Retenção do Rio Horto – Architecture Landscape and Strengthening the Drainage Capacity of the Water Line of Santa Marinha, in the surroundings of Av. Ramos Pinto Santa Marinha., translated_summary
  • curprev 02:0902:09, 9 July 2021DG Regio talk contribs 7,798 bytes −1,118 Removed claim: summary (P836): The present application consists of the execution of the constructions of Retention of the Horto River, Alguidar de Retenção do Rio Horto – Architecture Landscape and Strengthening the Drainage Capacity of the Water Line of Santa Marinha, in the surroundings of Av. Ramos Pinto Santa Marinha., remove_old_english_translation
  • curprev 01:4401:44, 9 July 2021DG Regio talk contribs 8,916 bytes +160 Changed label, description and/or aliases in en: translated_label
  • curprev 01:4401:44, 9 July 2021DG Regio talk contribs 8,756 bytes +1,118 Created claim: summary (P836): The present application consists of the execution of the constructions of Retention of the Horto River, Alguidar de Retenção do Rio Horto – Architecture Landscape and Strengthening the Drainage Capacity of the Water Line of Santa Marinha, in the surroundings of Av. Ramos Pinto Santa Marinha., translated_summary

8 July 2021

7 July 2021