Revision history of "Disassociating Albufeira do Açude-Ponte de Coimbra and Stabilisation of the right bank of the Mondego River between the Santa Clara Bridge and the Dam – Coimbra Bridge" (Q2981671)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:2119:21, 3 August 2022DG Regio talk contribs 43,370 bytes +26,242 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:5208:52, 9 July 2021DG Regio talk contribs 9,636 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 9,205 bytes +1,205 Created claim: summary (P836): The operation is composed of the project "Disassor. da Albufeira do Açude-Ponte de Coimbra" which has as its object the removal of sediments from Albufeira do Açude and the "Estabiliz. of the right bank of the Mond. between Pte Sta. Clara e o Açude – Ponte de Coimbra" the stability of the containment structures on the right bank, as well as the respective inspection services., translated_summary
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 8,000 bytes −1,205 Removed claim: summary (P836): The operation is composed of the project "Disassor. da Albufeira do Açude-Ponte de Coimbra" which has as its object the removal of sediments from Albufeira do Açude and the "Estabiliz. of the right bank of the Mond. between Pte Sta. Clara e o Açude – Ponte de Coimbra" the stability of the containment structures on the right bank, as well as the respective inspection services., remove_old_english_translation
  • curprev 01:4401:44, 9 July 2021DG Regio talk contribs 9,205 bytes +230 Changed label, description and/or aliases in en: translated_label
  • curprev 01:4401:44, 9 July 2021DG Regio talk contribs 8,975 bytes +1,205 Created claim: summary (P836): The operation is composed of the project "Disassor. da Albufeira do Açude-Ponte de Coimbra" which has as its object the removal of sediments from Albufeira do Açude and the "Estabiliz. of the right bank of the Mond. between Pte Sta. Clara e o Açude – Ponte de Coimbra" the stability of the containment structures on the right bank, as well as the respective inspection services., translated_summary

8 July 2021

7 July 2021