Revision history of "Construction of the Highlighted Section of Iron Ferdinand of the A.H.B.M. of the Council of Seixal" (Q2981634)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:2019:20, 3 August 2022DG Regio talk contribs 43,452 bytes +26,357 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:5208:52, 9 July 2021DG Regio talk contribs 9,549 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 9,118 bytes +1,218 Created claim: summary (P836): The operation aims to provide its CB with an infrastructure suitable for operationality as it is currently operating in a relocated infrastructure in its area of operation. This application meets the technical eligibility criteria of beneficiaries and the operation meets the defined general and specific eligibility criteria, with the expected implementation duration of approximately 14 months., translated_summary
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 7,900 bytes −1,218 Removed claim: summary (P836): The operation aims to provide its CB with an infrastructure suitable for operationality as it is currently operating in a relocated infrastructure in its area of operation. This application meets the technical eligibility criteria of beneficiaries and the operation meets the defined general and specific eligibility criteria, with the expected implementation duration of approximately 14 months., remove_old_english_translation
  • curprev 01:4301:43, 9 July 2021DG Regio talk contribs 9,118 bytes +157 Changed label, description and/or aliases in en: translated_label
  • curprev 01:4301:43, 9 July 2021DG Regio talk contribs 8,961 bytes +1,218 Created claim: summary (P836): The operation aims to provide its CB with an infrastructure suitable for operationality as it is currently operating in a relocated infrastructure in its area of operation. This application meets the technical eligibility criteria of beneficiaries and the operation meets the defined general and specific eligibility criteria, with the expected implementation duration of approximately 14 months., translated_summary

8 July 2021

7 July 2021