Revision history of "Maintenance of the Dunar Ecosystem of Mira Beach" (Q2981463)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:1619:16, 3 August 2022DG Regio talk contribs 38,007 bytes +22,450 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:5608:56, 9 July 2021DG Regio talk contribs 9,110 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:4801:48, 9 July 2021DG Regio talk contribs 8,679 bytes +1,097 Created claim: summary (P836): The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways., translated_summary
  • curprev 01:4801:48, 9 July 2021DG Regio talk contribs 7,582 bytes −1,097 Removed claim: summary (P836): The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways., remove_old_english_translation
  • curprev 01:3901:39, 9 July 2021DG Regio talk contribs 8,679 bytes +107 Changed label, description and/or aliases in en: translated_label
  • curprev 01:3901:39, 9 July 2021DG Regio talk contribs 8,572 bytes +1,097 Created claim: summary (P836): The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways., translated_summary

8 July 2021

7 July 2021