Revision history of "CANTINA B Energy Efficiency Project of IPC-SAS" (Q2981236)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:1019:10, 3 August 2022DG Regio talk contribs 42,204 bytes +25,498 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:5108:51, 9 July 2021DG Regio talk contribs 9,473 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:3301:33, 9 July 2021DG Regio talk contribs 9,042 bytes +105 Changed label, description and/or aliases in en: translated_label
  • curprev 01:3301:33, 9 July 2021DG Regio talk contribs 8,937 bytes +1,230 Created claim: summary (P836): The CANTINA B project of the IPC-SAS includes the installation of thermal insulation in the roof, aluminum frames with thermal cut and double glazing, LED luminaires, efficient HVAC equipment, solar thermal system for heating AQS, reduces primary energy consumption by 41 %, avoids the emission of 21tCO2/year, generates savings of EUR 12,245.50/year and allows the passage of the building to energy class B., translated_summary

8 July 2021

7 July 2021